![]() The rest of the Bertram Road and bridge replacement project will continue. “Due to the age of the bridge, it was always a possibility that the structure could be damaged during the lifting and moving process, and that’s what happened.” “We are disappointed that the Blue Bridge most likely will not be moved and reused at the Nature Center as planned," said Linn County Assistant Engineer Garret Reddish. Engineering contractors will evaluate the bridge structure to make a final determination. Due to the damage sustained while lifting the bridge, the Linn County Secondary Road Department does not think the structure is salvageable. The 146-year-old Bertram “Blue” Bridge was to be moved to the Indian Creek Nature Center for use on the trail system at the Nature Center. Bertram Road was already closed to traffic – and still is – because it is an active construction site. Retrieved 14 November 2020.Today, as crews were lifting the Bertram “Blue” Bridge off its foundation as part of the planned bridge replacement and relocation project, the structure twisted and was damaged in the process.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |